HOCHTIEF ·
·

Swinoujscie

Time of construction: 07.2010-04.2013
Contractor: Consortium with among others companies of HOCHTIEF
Investor: Naval Office in Szczecin

Characterisation: The scope of work of HOCHTIEF included:
- a new breakwater with a length of 2,974.3 metres
- a western groin with a length of 255.8 metres forming, along with the breakwater head, an entrance to the new external port
- a new fairway with a length of 1,742.1 metres and a width of 200 metres leading to the external port
- a ship rotator similar to the ellipse, with a diameter of 630 metres and 1,000 metres