HOCHTIEF ·
·

Warsaw

 

(©Hines Polska)

Time of construction: 07.2016-end of 2017
Leasable area: about 20,600 square meters
General contractor: HOCHTIEF Polska Branch in Warsaw
Investor: Hines Polska

Characterisation: During the 2nd stage of the Proximo office complex, a cascade-style building with seven to eleven above-ground floors and a total leasable area of approximately 20,600 square meters will be constructed. In the underground part, changing rooms and showers for cyclists are planned, and the ground floor will feature service premises. The building will be fully accessible for disabled people. Parking facilities will be provided in a two-level underground car park, in a garage on the ground floor and in the above-ground car park (over 200 parking spaces in total). The scope of construction works also includes internal roads on the premises, technical infrastructure and land development measures around the building. Just like the facility constructed during the 1st stage, the second Proximo building is characterised by a large floor area, a low ratio of common areas, excellent surface lighting and optimum office depth. The investment will be implemented in accordance with the requirements for the “VERY GOOD” level of the BREEAM environmental certificate.

HOCHTIEF Polska has built the 1st stage of the Proximo in 2014-2016.