Warsaw

     

(©Vastint Poland, ©HOCHTIEF Polska)

Time of construction: 11.2014-05.2017
Area: about 102,000 square metres
Investor: Vastint Poland

Description: In the 2nd stage of the Business Garden Warszawa a complex of five buildings was constructed. Four of them have seven overground levels and two underground levels with car parks and technical rooms. One building has six-storeys with one underground level. The buildings were constructed using mixed technologies, i.e. the underground part was made as a reinforced concrete structure cast in place, the so-called "white basin technology", and the above-ground part was made of prefabricated elements. The buildings were made using modern design and technical solutions, in accordance with the guidelines of the LEED Platinum certification. 60 percent of the plot is occupied by landscaped areas, including the so-called green roofs, high grasses, trees and water pools.

HOCHTIEF Polska has built the 1st stage of the Business Garden Warszawa in 2011-2013.

Award:
- In 2017 the project won the “Construction of the Year” title (the 2nd degree award) in the office buildings category, in contest organized by the Polish Association of Construction Engineers and Technicians (PZiTB)
- The project won Prime Property Prize 2017 contest in "Green Building" category